{"id":79978,"date":"2026-04-07T08:17:34","date_gmt":"2026-04-07T08:17:34","guid":{"rendered":"https:\/\/biometano.lneg.pt\/?page_id=79978"},"modified":"2026-07-20T09:42:02","modified_gmt":"2026-07-20T09:42:02","slug":"public-funding-for-projects","status":"publish","type":"page","link":"https:\/\/biometano.lneg.pt\/?page_id=79978&lang=en","title":{"rendered":"Public funding for projects"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"79978\" class=\"elementor elementor-79978\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9c44fb5 e-flex e-con-boxed e-con e-parent\" data-id=\"9c44fb5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-09174a5 elementor-widget elementor-widget-text-editor\" data-id=\"09174a5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>Phase 1 (2024\u20132026) of the Biomethane Action Plan (PAB 2024\u20132040) foresees the creation of the biomethane market in Portugal.<\/p><p>During this period, PAB proposes various measures to stimulate investment in the conversion of existing biogas plants, primarily using municipal solid waste and sewage sludge, and in new biomethane production plants, primarily using residual biomass from the agricultural, livestock and agro-industrial sectors.<\/p><p>However, the financing of business projects to promote the biomethane market in Portugal, through Capital Expenditures (CAPEX) support, began as early as 2020 with the first PT2020 call for proposals POSEUR 01 2020 19. This was followed by three calls between 2021 and 2024 under the Recovery and Resilience Plan (PRR), as well as one Operational Expenditure (OPEX) support auction for the centralised purchase of biomethane and hydrogen, launched in 2024.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-d9827fa e-flex e-con-boxed e-con e-parent\" data-id=\"d9827fa\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3917652 cea-btn-tablet-align-left cea-view-framed cea-shape-circle elementor-invisible elementor-widget elementor-widget-ceafeaturebox\" data-id=\"3917652\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;_animation&quot;:&quot;fadeInUp&quot;,&quot;_animation_delay&quot;:400}\" data-widget_type=\"ceafeaturebox.default\">\n\t\t\t\t<div class=\"elementor-widget-container feature-box-wrapper feature-box-classic\">\n\t\t\t<div class=\"media\"><div class=\"media-icon-part\"><\/div><div class=\"media-body\"><h2 class=\"feature-box-title\">CAPEX supported projects already funded<\/h2><\/div><!-- .media-body --><\/div><!-- .media -->\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8ecd676 e-flex e-con-boxed e-con e-parent\" data-id=\"8ecd676\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-10f8a76 elementor-widget elementor-widget-text-editor\" data-id=\"10f8a76\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>The four calls for proposals published to date have funded a total of 16 biomethane projects with a total installed production capacity of 107 MW and an expected annual output of 846 GWh\/year, distributed as follows:<\/p><p><a style=\"background-color: #ffffff;\" href=\"https:\/\/poseur.portugal2020.pt\/pt\/avisos\/avisos-de-candidatura\/poseur-01-2020-19-apoio-a-projetos-de-produ%C3%A7%C3%A3o-de-gases-de-origem-renov%C3%A1vel-para-autoconsumo-eou-inje%C3%A7%C3%A3o-na-rede\/\" target=\"_blank\" rel=\"noopener\">Call POSEUR 01 2020 19<\/a>\u00a0\u2013 With a total budget of \u20ac40 million, it funded 1 project with 9 MW of capacity to be installed, corresponding to a projected production of 79 GWh\/year.<\/p><p><a style=\"background-color: #ffffff;\" href=\"https:\/\/www.fundoambiental.pt\/apoios-prr\/c14-hidrogenio-e-renovaveis\/01c14-i01-hidrogenio-e-gases-renovaveis.aspx\" target=\"_blank\" rel=\"noopener\">Call No. 01\/C14 i01\/2021<\/a>\u00a0\u2013 With a total budget of \u20ac102 million, it funded 3 projects with a total installed capacity of 21 MW, corresponding to a projected production of 164 GWh\/year.<\/p><p><a style=\"background-color: #ffffff;\" href=\"https:\/\/www.fundoambiental.pt\/apoios-prr\/c14-hidrogenio-e-renovaveis\/02c14-i012023-hidrogenio-e-gases-renovaveis.aspx\" target=\"_blank\" rel=\"noopener\">Call No. 02\/C14 i01\/2023<\/a>\u00a0\u2013 With a total budget of \u20ac83 million, it funded 4 projects with a total installed capacity of 27 MW, corresponding to a projected production of 218 GWh\/year.<\/p><p><a style=\"background-color: #ffffff;\" href=\"https:\/\/www.fundoambiental.pt\/apoios-prr\/c21-repowereu1\/rp-c21-06-medida-reforcada-capacidade-adicional-de-hidrogenio-e-gases-renovaveis.aspx\" target=\"_blank\" rel=\"noopener\">Call No. 01\/RP C21 i06\/2024<\/a>\u00a0\u2013 With a total budget of \u20ac70 million, it funded 9 projects with a total installed capacity of 59 MW, corresponding to a projected production of 464 GWh\/year.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-0a03596 e-flex e-con-boxed e-con e-parent\" data-id=\"0a03596\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-92468ac cea-btn-tablet-align-left cea-view-framed cea-shape-circle elementor-invisible elementor-widget elementor-widget-ceafeaturebox\" data-id=\"92468ac\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;_animation&quot;:&quot;fadeInUp&quot;,&quot;_animation_delay&quot;:400}\" data-widget_type=\"ceafeaturebox.default\">\n\t\t\t\t<div class=\"elementor-widget-container feature-box-wrapper feature-box-classic\">\n\t\t\t<div class=\"media\"><div class=\"media-icon-part\"><\/div><div class=\"media-body\"><h2 class=\"feature-box-title\">Auctions Supporting OPEX<\/h2><\/div><!-- .media-body --><\/div><!-- .media -->\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c159bde elementor-widget elementor-widget-text-editor\" data-id=\"c159bde\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>The\u00a0<a href=\"https:\/\/www.dgeg.gov.pt\/pt\/areas-setoriais\/energia\/combustiveis\/procedimentos-gases-renovaveis\/1%C2%BA-leil%C3%A3o-compra-centralizada-biometano-e-hidrog%C3%A9nio\/\" target=\"_blank\" rel=\"noopener\">first electronic auction for the centralised procurement of biomethane and hydrogen<\/a>\u00a0was launched in 2024, under the direction of the Directorate General for Energy and Geology (DGEG), in coordination with CURg, and implemented via the Procurement Platform managed by OMIP.<\/p><p>The biomethane lot was limited to the centralised purchase of a maximum of 150 GWh\/year. The auction resulted in a single bid, which secured the award of 1.99 GWh\/year at a price of \u20ac62\/MWh.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-debd0f1 e-flex e-con-boxed e-con e-parent\" data-id=\"debd0f1\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4752ced cea-btn-tablet-align-left cea-view-framed cea-shape-circle elementor-invisible elementor-widget elementor-widget-ceafeaturebox\" data-id=\"4752ced\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;_animation&quot;:&quot;fadeInUp&quot;,&quot;_animation_delay&quot;:400}\" data-widget_type=\"ceafeaturebox.default\">\n\t\t\t\t<div class=\"elementor-widget-container feature-box-wrapper feature-box-classic\">\n\t\t\t<div class=\"media\"><div class=\"media-icon-part\"><\/div><div class=\"media-body\"><h2 class=\"feature-box-title\">Preliminary Registration Requests <\/h2><\/div><!-- .media-body --><\/div><!-- .media -->\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-4dd93c3 e-flex e-con-boxed e-con e-parent\" data-id=\"4dd93c3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9dda99e elementor-widget elementor-widget-text-editor\" data-id=\"9dda99e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>DGEG will periodically update\u00a0<a href=\"https:\/\/www.dgeg.gov.pt\/pt\/areas-setoriais\/energia\/combustiveis\/operadores-do-sng\/produtor-de-gases-de-origem-renovavel-e-de-baixo-teor-de-carbono\/\" target=\"_blank\" rel=\"noopener\">here<\/a>\u00a0the information on the list of Preliminary Registration Requests submitted to DGEG, concerning the intention to develop new biomethane production plants scheduled to come into operation by 2030.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Phase 1 (2024\u20132026) of the Biomethane Action Plan (PAB 2024\u20132040) foresees the creation of the biomethane market in Portugal. During this period, PAB proposes various measures to stimulate investment in the conversion of existing biogas plants, primarily using..<\/p>\n","protected":false},"author":5,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-toc-sticky.php","meta":{"footnotes":""},"class_list":["post-79978","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/biometano.lneg.pt\/index.php?rest_route=\/wp\/v2\/pages\/79978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/biometano.lneg.pt\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/biometano.lneg.pt\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/biometano.lneg.pt\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/biometano.lneg.pt\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=79978"}],"version-history":[{"count":17,"href":"https:\/\/biometano.lneg.pt\/index.php?rest_route=\/wp\/v2\/pages\/79978\/revisions"}],"predecessor-version":[{"id":80692,"href":"https:\/\/biometano.lneg.pt\/index.php?rest_route=\/wp\/v2\/pages\/79978\/revisions\/80692"}],"wp:attachment":[{"href":"https:\/\/biometano.lneg.pt\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=79978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}